Camley Street Waterfall Finally Turned Off

After more than 3 months, the waste of hundreds of thousands of gallons of water has finally been fixed. Residents of EVTRA and Camden Council made repeated requests to the developer and Thames Water to halt the discharge. The water system had been vandalised in November 2016 and this is why water was gushing 24/7.


Posted

in

by

Tags: